Replacement rectifiers OS Berghem

Name project: Replacement rectifiers OS Berghem
Sector: Infra
Location: Berghem
Client: ProRail
Installer: Strukton
Completion: 2018

At the Berghem substation, 10kV alternating current comes in, which goes through a transformer and rectifier and is converted to 1500V direct current. This direct current is intended for the overhead lines. At this location, two rectifiers were replaced, as well as all associated cables and transits.

The existing MCT RGB frames are reused and sealed with new MCT blocks and filling material. Insert blocks have been used here, which exactly match the different cable diameters in terms of diameter. This keeps the installation time as low as possible. In this way, the cables will be safely resealed for at least the next 25 years.